EDMONTON INTERNATIONAL AIRPORT: LEDUC HIGHWAY INTERCHANGE

Project Starting Date

Fall, 2016

Project End

Fall, 2016

Category

Highway Infrastructure

PROJECT DESCRIPTION

As part of the Leduc Highway Interchange initiative, Optimised was tasked with numerous highway infrastructure priorities.

Work Scope

  • Coordinated with Black & MacDonald to execute on signage pedestal foundation installation
  • Supervised layout and verified subgrade conflicts
  • Day-lighted existing services and mitigated safety hazards
  • Executed on pile installations ranging from 1500-1700mm diameter, 8000-12000mm in depth
  • Verified pile locations and exact locations for as-built packages
  • Handed over completed job scope documents and photos to WSP supervisors to execute on structural installations above grade

Other Projects

Freedom, Rogers, and Telus Mobility and Wire Line 5G Roll Out

Rogers Wireless Western Canada System Upgrade

Alberta First Responder Reconstruction Project

Western Alberta Transmission Line Development

Fort McMurray International Airport Project

Have a project in mind or questions about our innovative civil infrastructure solutions? Get in touch with us today to explore how we can bring your vision to life.