WESTERN ALBERTA TRANSMISSION LINE DEVELOPMENT

Project Starting Date

Summer, 2014

Project End

Fall, 2014

Category

Transmission Tower Foundations

Project Description

Collaborated with SNC Lavalin and Keller Foundations to perform installation of power line transmission tower foundations in the towns of Pincher Creek and Innisfail.

Work Scope

  • Qualified to work in brown field conditions, which included live sub stations.
  • Liaised with SNC engineers to trouble shoot geotechnical and design challenges regarding civil requirements on project.
  • Worked with vendors to create formwork systems for 10-12’ diameter piling to accommodate foundation hardware.
  • Performed quality control checks on third party supplied material.
  • Worked with field staff to layout, form, place and finish concrete.
  • Successfully completed piling and ensured there was no damage to local farming community with respect to machinery or contamination.

Other Projects

Freedom, Rogers, and Telus Mobility and Wire Line 5G Roll Out

Leduc Highway Interchange

Rogers Wireless Western Canada System Upgrade

Alberta First Responder Reconstruction Project

Fort McMurray International Airport Project

Have a project in mind or questions about our innovative civil infrastructure solutions? Get in touch with us today to explore how we can bring your vision to life.